List of surveys status
1. VESSEL`S INFORMATION
Name of vessel:   SLAVYANETS
Type of vessel: Tug Call sign:  UBLH7
RS Number:  885222 IMO:  8826840
Flag:   Russia Port of registry:   Vladivostok
Date of build:  15.01.1990 Date of keel laying:  06.01.1988
Gross tonnage:  270.00 Deadweight:  89.00
Length overall (extreme):  35.78 Breadth:  9.49 Depth:  4.50
RS Class notation:  KM(*) UL R2 AUT2 tug
Class status:   CLASS VALID, THE SHIP IS UNDER SURVEY   05.06.2020
2. Manager
Manager "SLAVYANKA SHIPYARD", JOINT-STOCK COMPANY
IMO 1396374
Address Russia, 692701 Primorskiy kr., Khasanskiy r-n, p. Slavyanka, ul. Vesennyaya, d. 1
Email midel@ssrz.ru
Company Website
3. CLASS CERTIFICATES AND SURVEYS
3.1. Surveys
Survey Code Date of last survey Date / time the next survey Status Postponement
Special Periodical Survey CLC.S 05.06.2015 05.06.2020 O/DUE
Special Periodical Survey SEC.S 05.06.2015 05.06.2020 O/DUE
Special Periodical Survey NOSG.S 05.06.2015 05.06.2020 O/DUE
Special Periodical Survey NLL.S 05.06.2015 05.06.2020 O/DUE
Annual Survey NLL.A 05.09.2019 05.03.2021 05.09.2021
Annual Survey NOSG.A 05.09.2019 05.03.2021 05.09.2021
Annual Survey SEC.A 05.09.2019 05.03.2021 05.09.2021
Annual Survey CLC.A 05.09.2019 05.03.2021 05.09.2021
Propeller Shaft and Stern Tube Survey - CL CLC.PSSC 31.05.2018 31.05.2023
Internal survey of air receivers CLC.ARIE 05.06.2015 05.06.2020 O/DUE
Internal survey of vessels of fire-fighting systems CLC.FVIE 11.08.2010 05.06.2020 O/DUE
Hydraulic test of vessels of fire-fighting systems CLC.FVHT 11.08.2010 05.06.2020 O/DUE
Hydraulic test of pipelines of fire-fighting systems CLC.FPHT 11.08.2010 05.06.2020 O/DUE
Remeasurement TC-12.RM 05.06.2000
Intermediate Survey/ Audit NOSG.IN 09.10.2018 05.03.2022 05.09.2023
Intermediate Survey/ Audit CLC.IN 09.10.2018 05.03.2022 05.09.2023
Bottom Survey CLC.D 21.04.2020 21.04.2023
3.2. Conditions of Class
Report No. Content Due date Status Clearance / postponement Report No.
19.06877.170 The newly installed mooring capstan to be present on an accordance with approved tehnical documentation by RS. 05.06.2020 O/DUE
20.03718.170 The plating of the upper deck in the area of frs.: 16-18 on the CL and the plating of the wheelhouse in the area of frs.: 25-26 on the PS 1st strake from the CL are to be submitted for survey after removing double plates, if necessary repair are to be carried out. 05.06.2020 O/DUE
4. STATUTORY CERTIFICATES AND SURVEYS
4.3. Conditions
No conditions